Connection to the system

Connection to the system
Connection Process
Items not to be disposed of in the System
Specifications and Technical Information for private house connection
Grease traps (for organic greases & oils)
Oil Separator
Construction details for pumping Stations
Division of Plots

Who and when must be connected to the sewerage system

Following the construction of the sewerage system in public streets and their delivery to the Board, announcements similar to the one that follows will be made in the press for the connection to the public sewerage system: 

Every owner or occupant of a service location that is used for residential, occupational trading, business, employment for recreation or other purposes and is located in streets or areas that are referred to in the tables published in the official Gazette and in other newspapers as announcements, is obliged to construct by the deadline referred to in the announcement, at his own expense and according to the permit that is issued from the Sewerage Board of Limassol – Amathus, a private sewer that can be connected to the public sewer. Connection to the system is allowed only after the relevant written authorisation from the Board and Green Card is obtained. 

After the issue by the Board of the written authorisation according to the Regulations of the SBLA (Part I V Regulation 7(5), the owner in question or occupant is obliged to dispose all the sewage, waters, industrial liquid waste, or other waste of this service location through the public sewer and to fill with appropriate materials any septic sinks, absorbent sinks or similar private installations of sewage disposal in a way that the Board is satisfied.

Συνημμένα Αρχεία: 

Connection process

Application form

Necessary documents to be submitted with the application for the construction permit – the Sewerage Regulations of Limassol – Amathus of 1991- 1999 

PART IV – PERMITS

Every application must be submitted to the Board in duplicate for the issue of the permit for the construction or reconstruction or execution of alterations, additions or repairs of the building's sewer, private sewer or private system of sewage disposal or for the installation of sanitary installations and hygiene supplies. This application must be signed by the owner or occupant of the service location or by an authorised representative and be submitted in the format that the Board may specify at each time.

The application should be accompanied by the following documents:

The holder of the permit should give or see that a written notice of at least ten working days will be delivered to the Board's office in relation to the date and time during which he plans to start any construction work.

Items that should not be flushed down the drain or toilet

* The use of a waste disposal unit in the kitchen is prohibited.

Specifications and Technical Information for private house connection

Financial Statements are in Adobe Acrobat Reader Format. (Download Adobe Acrobat Reader.)

Grease traps (for organic greases & oils)

Grease traps are obligatory for the kitchens of restaurants, confectioneries, bakeries, etc.

 

Financial Statements are in Adobe Acrobat Reader Format. (Download Adobe Acrobat Reader.)

Συνημμένα Αρχεία: 

Oil Separator

Financial Statements are in Adobe Acrobat Reader Format. (Download Adobe Acrobat Reader.)

Συνημμένα Αρχεία: 

Construction details for pumping Stations

* Central switch
* Alternate of operation of pumps in the case of installation of backup pump (time switch).
* Selector switch (off/auto) for eac

Division of Plots

Along with the application that is submitted to the responsible municipality or other authority for obtaining building permit or authorization for opening up or construction of road in the region of the Board, an application for authorization of construction of sewerage system must also be submitted to SBLA. The application must be submitted along with the following documents: Topographical drawing with the plot division. Drawing in scale 1:1000 with the proposed network of sewerage (in paper and in electronic form). Proposed road profiles. Building permit already obtained (copy). Title deed of property Storm drain sewers if it is required.

The owner must appoint supervising Engineer for supervision of work.

These Regulations are applied in the entire region of the Board, independent if there are or not sewers in the area.